Why Do We Need to Migrate Virtual Machines?

A Complete, Easy-to-Understand Guide

Virtual machine (VM) migration might seem like a deep, purely technical process happening somewhere in the background of data centers—but in reality, it solves some of the biggest challenges in cloud operations today. From preventing downtime to improving performance and enhancing disaster recovery, VM migration is a core capability that keeps modern digital platforms running smoothly.

Below is a fresh, human-friendly breakdown of why VM migration matters, how it works, and the different methods used in cloud environments.

Why Virtual Machines Are Migrated

1. Hardware Maintenance Without Disruptions

Traditionally, upgrading or repairing physical servers required planned downtime—usually late at night or on weekends. VM migration eliminates this problem completely.

If a server needs new memory, a CPU upgrade, or hardware repair, the cloud provider can simply move all affected virtual machines to another healthy host. Once the VMs are relocated, the server can be worked on without causing any service interruptions. End-users never notice anything happening behind the scenes.

2. Smarter Load Balancing

Sometimes one server ends up overloaded while another is barely being used. This imbalance is inefficient and can slow down applications running on the busier server.

Migration lets hypervisors automatically shift VMs away from an overloaded host to a less busy one. This ensures:

  • Better utilization of hardware

  • Stable application performance

  • Reduced risk of bottlenecks

3. Disaster Prevention and Recovery

VM migration is also a vital part of disaster management.
If a server shows early signs of failure, virtual machines can be evacuated in advance.
During large-scale incidents, they can even be relocated to an entirely different data center.

4. Energy Savings During Low Usage

During off-peak hours, such as nights or weekends, workloads typically decrease. VMs can be consolidated onto fewer machines, and unused servers can be powered down. This dramatically reduces energy consumption and operational costs.

Two Primary Types of VM Migration

Not all migration scenarios are alike. The method chosen depends on the workload and the expected outcome. The two major types are:

1. Cold Migration

Cold migration is the simpler method.
It involves:

  1. Shutting down the virtual machine

  2. Copying its data to a new host

  3. Restarting it on the destination server

This process is similar to moving a powered-off desktop computer to a new desk.

Pros:

  • Very reliable

  • No risk of data changing mid-transfer

Cons:

  • Requires downtime, making it suitable only for non-critical workloads

2. Live Migration (Hot Migration)

Live migration is far more advanced.
It moves a running virtual machine from one host to another without disconnecting users or stopping applications.

The VM keeps operating as usual, remains connected to the network, and users remain completely unaware that it has been relocated.

This technology enables:

  • Zero-downtime maintenance

  • Real-time load balancing

  • Fault tolerance and quick recovery from hardware issues

How Live Migration Works: A Step-By-Step View

Live migration is a coordinated dance between two physical servers, controlled by the hypervisor. The most widely used approach is called pre-copy migration. Here’s how it happens:

1. Preparation Phase

The hypervisor decides (or is instructed) to move a VM from Host A to Host B.
It verifies:

  • Available CPU and RAM on the destination server

  • Adequate network bandwidth

  • Shared access to the VM’s storage

It's crucial to note that the VM’s disk is not moved—only memory and CPU state are transferred.

2. Pre-Copy Rounds Begin

The hypervisor copies the entire memory content of the VM to Host B.
But the VM continues running, which means some memory pages change during the copy.

3. Repeated Copying of Changed Pages

Only modified (“dirty”) pages are transferred in each iteration. With every round, the number of dirty pages decreases.

4. Switchover Phase

Once only a tiny number of pages remain, the hypervisor briefly pauses the VM (usually a few milliseconds) to transfer the final memory updates and CPU state.

5. Commit and Resume

Host B resumes the VM instantly. Network routing updates, and from a user perspective, everything continues as if nothing happened.

Different Methods of Live Migration

Although pre-copy is the standard technique, the migration type depends on storage setup and workload.

1. Shared Storage Migration

This is the most common approach.
Both source and destination hosts access the same shared storage (like a SAN).
Only:

  • Memory

  • CPU state

are moved. This makes migration fast and efficient.

2. Live Storage Migration (Without Shared Storage)

If shared storage isn’t available, both memory and disk data must be transferred.
This is more complex and time-consuming because:

  • Disk blocks need to be copied

  • The VM keeps updating data as it runs

  • Multiple rounds of copying are required

This method is typically used when moving VMs across data centers or different storage systems.

3. Post-Copy Migration

A less common technique where:

  • Only minimal CPU state is copied first

  • The VM starts running immediately on the target

  • Missing memory pages are fetched on-demand

This can speed up migrations but may temporarily reduce performance if many pages need fetching.

Advantages of VM Migration

✔ Zero-Downtime Maintenance

Businesses can update hardware or perform repairs without shutting down applications.

✔ Better Performance and Resource Use

Load balancing prevents one VM from affecting others due to excessive resource consumption.

✔ Stronger Disaster Recovery

VMs can be moved away from failing hardware or relocated during large-scale emergencies.

✔ Lower Energy Usage

By consolidating workloads, data centers can power down idle servers and cut electricity and cooling costs.

Challenges and Things to Consider

Even with all its benefits, VM migration does come with challenges:

1.Network Bandwidth Consumption

Migration traffic can overload networks if not carefully managed, especially at large scale.
Cloud providers often use dedicated high-speed networks for this reason.

2.Temporary Performance Impact

Copying memory and CPU state consumes resources.
For extremely latency-sensitive applications, even a brief pause during switchover can be problematic.

3.Security Concerns

VM memory is transmitted across the network.
For sensitive workloads, migration traffic must be encrypted to prevent potential interception.

4.Not All VMs Are Suitable for Live Migration

Some VMs constantly modify large volumes of memory, making it hard for the pre-copy process to converge.
Such workloads may experience slightly noticeable downtime during the final switch.

The Migration Manager: The Controller Behind the Scenes

Every live migration relies on a sophisticated software component called the migration manager.
Think of it as the air-traffic control system for virtual machines.

It:

  • Ensures the destination server is compatible

  • Checks CPU models and available resources

  • Measures network latency

  • Validates storage accessibility

  • Prevents migration failures

  • Directs and monitors the entire process

This orchestration is critical for safe, predictable, automated VM movement.

Beyond a Single Data Center: Cross-Cloud Migration

Modern businesses often run hybrid or multi-cloud architectures.
This has led to powerful cross-cloud migration tools that can move VMs from:

  • Private clouds → AWS

  • Private clouds → Azure

  • One public cloud → another

These scenarios require:

  • Hypervisor conversions

  • Network reconfiguration

  • Disk and memory transfer over public networks

But with dedicated migration platforms, the process has become more seamless than ever.

How Containers Fit into the Story

Containers and VMs are often compared, but their migration mechanisms are very different.

Containers don’t carry their own operating system; they share the host kernel.
Because their state is stored externally (e.g., in a database), migration is simple:

  1. The orchestrator (like Kubernetes) stops the container instance

  2. A new instance starts on another node

This lightweight process can take just a few seconds—much faster than migrating an entire VM.

Conclusion: The Hidden Engine Powering Cloud Agility

Virtual machine migration is one of the most important technologies behind today’s cloud reliability and flexibility. It enables:

  • Maintenance without downtime

  • Performance optimization

  • Disaster resilience

  • Energy-efficient operations

The next time you use a cloud service that never seems to go offline, remember:
live migration is silently working behind the scenes, shifting workloads, preventing failures, and keeping the digital world responsive 24/7.

Did this answer your question?